Five projects so far, 33 doors. Read how we found each lot, what the approvals took, and what we built.

Reserve at Rosewood

At a glance

The work so far

5
Projects
33
Doors
0
Under way

16 duplexes · 2462 Millwood

Millwood Redevelopment

The lot. Vacant land. The zoning allowed for medium density residential development. What made it work was a visionary investor who saw the potential where others saw nothing.

The deal. This was a Joint Venture with the investor/visionary. Lafaye took care of the sitework, zoning, all requirements and stipulations by the City of Columbia. The owner wanted a hands off approach and for us to handle everything but the design, which he outsourced to a consultant that we work with frequently. We took care of all of the headaches.

See the project

1 single-family homes · Shandon

Preston Gem

The lot. The investor found the lot and called us to see what we could do with it. This was a single family home concept adapted for students.

The deal. The owner wanted a hands off approach with no fuss. That's what we delivered.

See the project

4 townhomes · Devine Street district

The Cottages on Devine

The lot. A leftover parcel from a larger development, at the corner of Lee and Maple streets in the heart of the Devine Street district. The kind of piece that gets passed over because it is too small to bother with.

The deal. The owner brought it to us with the land in hand and other rentals along the Devine Street corridor. An architect had drawn the plans, so this one was vertical only: we built it.

The build. Four townhomes in two buildings, designed to look like two cottages in a historic neighborhood, with the finishes of a Lafaye custom home. Nine months to build, finished in 2022.

Where it stands. They rent at a premium, for the location, the quality of the build and the walk to what the city has nearby.

See the project

8 patio homes · Off South Beltline Boulevard

Reserve at Rosewood

The lot. The investor already owned the land off South Beltline Boulevard and brought the project to us.

The deal. Entitlement, sitework and vertical, built turnkey with a local investment partner. We met with the city's zoning, planning and development staff, agreed a concept with them, then took it to the neighborhood associations for their buy-in. The planning commission and the engineering drawings took about six months.

The build. Eight single-story patio homes in phase one, each about 1,300 square feet with three bedrooms and two and a half baths, the layout renters in the area wanted most. Each works as a rental or a sale. The sitework took about four months and the homes six more; a bond on the last of the sitework let the homes start early. Eleven months to build, finished in 2022.

Where it stands. Phase two is next, on a quieter cul-de-sac away from the busier road, with finishes a step up. The investor chose to stagger the two phases.

See the project

4 doors · Near Benedict College

Duplexes on Richland Street

The lot. Two existing lots that each held less than they could. We met with City of Columbia zoning staff to subdivide them, and it took about a month. The zoning and the size of the lots made it possible.

The deal. Built for an investor who focuses on student rentals. Entitlement, sitework and vertical: the subdivision, the site and the homes.

The build. Two duplexes, four doors, built as student housing to the standard of a Lafaye custom home. Seven months to build, finished in 2025.

Where it stands. A test case for student housing near Benedict College, and it proved right. The duplexes rent at a premium.

See the project