The lot. The investor already owned the land off South Beltline Boulevard and brought the project to us.
The deal. Entitlement, sitework and vertical, built turnkey with a local investment partner. We met with the city's zoning, planning and development staff, agreed a concept with them, then took it to the neighborhood associations for their buy-in. The planning commission and the engineering drawings took about six months.
The build. Eight single-story patio homes in phase one, each about 1,300 square feet with three bedrooms and two and a half baths, the layout renters in the area wanted most. Each works as a rental or a sale. The sitework took about four months and the homes six more; a bond on the last of the sitework let the homes start early. Eleven months to build, finished in 2022.
Where it stands. Phase two is next, on a quieter cul-de-sac away from the busier road, with finishes a step up. The investor chose to stagger the two phases.
- 8
- Doors
- 2022
- Year
- Complete
- Where it stands
- 11‑month build
- Timeline
- Entitlement, sitework and vertical
- Which service