For investors

How our projects work

We take a project from land to keys, or any part of it, from a duplex up to a 30-unit townhome project. The owner holds the land, the project and the homes the whole way, and we work for a fixed fee or as a joint venture, never cost-plus. Our focus is infill in Columbia's in‑town neighborhoods.

The Cottages on Devine

Services offered

Four ways to work with us

01

Vertical only

We build from the ground up, on your architect's plans or a set of ours that fits the lot. The simplest of the four.

02

Sitework & Vertical

The approvals are done. We grade, move trees and fences, and get the lots ready to build, usually in one to three weeks. Then we build.

03

Entitlement, Sitework & Vertical

We take the site through zoning and approval with the city's departments, which can run four to 18 months. Then the sitework and the build.

04

Site Acquisition, Entitlement, Sitework & Vertical

We find the parcel, often off the market, and negotiate the price with the seller. Then the approvals, the sitework and the build: often 12 to 24 months in all.

How it runs

From land to keys

01

The site

Often an off-market lot. We reach out to the owner, see if they will sell, and negotiate the price.

02

Approvals

With the land under contract, the engineering starts and we meet the city about a land disturbance permit. On a larger project the zoning, the planning commission and the neighborhood associations come first.

03

Design and bids

While the permit is in review, the architect draws the homes inside and out, with the landscaping. We bid the sitework to site contractors and give the owner a hard estimate on the homes to approve.

04

Sitework

The horizontal phase takes a few days to a couple of months, depending on the site. Reserve at Rosewood took about four months.

05

The homes

Six to seven months to build. Then the certificate of occupancy, and the owner gets the keys, with the homes pre-leased where we can.

What goes wrong

Infill never starts on a clean site

An infill lot comes with easements, utilities, power lines and neighbors to look after, and the boundary lines, fences and trees always take work.

On a townhome job we finished in 2026, the site sat in a bowl. Once the topsoil and the trees came off, the ground was soft, and we brought in rock and a lot of dirt to stabilize it before the infrastructure could start.

Parking is the other one: the city limits spaces to keep paved area down. On a duplex the city talked about eight spaces early on, then held the final plans to four, and the owner wanted all eight. We settled it with the city by putting the rest on the street, through open communication between the owner, the city and us.

The homes

What we build and who rents it

What fits

A duplex up to a 30-unit townhome project, on lots of about a fifth of an acre to an acre and a half, zoned for medium to high density. Patio homes still work as rentals, but most infill parcels are too small for them.

Who rents

Anyone from a graduate looking for a first place to a downsizer in their sixties: students, young professionals, military and young families, empty nesters and single seniors who want to walk to what they need in town.

Interested in a project?

Start with a conversation. Wyman Bowers will walk you through how a project like Reserve at Rosewood was put together.